  • Predicting and Preventing Flow Accelerated Corrosion

    Flow accelerated corrosion (FAC) of carbon steels in water has been a concern in nuclear power production for over 40 years. Many theoretical models or empirical approaches have been developed to predict the possible occurrence, position, and rate of FAC. There are a number of parameters, which need to be incorporated into any model. Firstly there is a measure defining the hydrodynamic

    Get a Quote
  • Predicting and Preventing Flow Accelerated Corrosion

    Flow accelerated corrosion (FAC) of carbon steels in water has been a concern in nuclear power production for over 40 years. Many theoretical models or empirical approaches have been developed to predict the possible occurrence, position, and rate of FAC. There are a number of parameters, which need to be incorporated into any model. Firstly there is a measure defining the hydrodynamic

    Get a Quote
  • MITIGATION OF DEGREDATION OF HIGH ENERGY

    2007-11-21 · pressurized heavy water reactor (PHWR) in India, a pipe segment in the 10% feed water line to steam generator (SG-4) immediately downstream of flow element ruptured releasing steam in boiler room. This failure was assessed to be because of flow assisted corrosion (FAC).

    Get a Quote
  • MITIGATION OF DEGREDATION OF HIGH ENERGY

    2007-11-21 · pressurized heavy water reactor (PHWR) in India, a pipe segment in the 10% feed water line to steam generator (SG-4) immediately downstream of flow element ruptured releasing steam in boiler room. This failure was assessed to be because of flow assisted corrosion (FAC).

    Get a Quote
  • Verification of Online Monitoring Method on FAC Test for

    2010-5-14 · Verification of Online Monitoring Method on FAC Test for Carbon Steal Piping Y. Kurosaki, Y. Takagi: Tokio Electric Power Company, Japan ABSTRACT Although, wall-thinning problems of piping in power plants induced by high temperature water or two-phase (high temperature water and steam) flow attract attentions, the wall-thinning mechanism is

    Get a Quote
  • Verification of Online Monitoring Method on FAC Test for

    2010-5-14 · Verification of Online Monitoring Method on FAC Test for Carbon Steal Piping Y. Kurosaki, Y. Takagi: Tokio Electric Power Company, Japan ABSTRACT Although, wall-thinning problems of piping in power plants induced by high temperature water or two-phase (high temperature water and steam) flow attract attentions, the wall-thinning mechanism is

    Get a Quote
  • Experiences Using Neutralizing Amines - Water

    FAC occurs on carbon steel when the protective layer of magnetite (Fe3O4) is dissolved in a stream of flowing water or in wet steam. For this reason, FAC can be classified as either "single-phase" or as "two-phase". The removal of the magnetite exposes the base metal to corrosive attack and can result in rapid localized metal loss.

    Get a Quote
  • Experiences Using Neutralizing Amines - Water

    FAC occurs on carbon steel when the protective layer of magnetite (Fe3O4) is dissolved in a stream of flowing water or in wet steam. For this reason, FAC can be classified as either "single-phase" or as "two-phase". The removal of the magnetite exposes the base metal to corrosive attack and can result in rapid localized metal loss.

    Get a Quote
  • Control of Flow-Accelerated Corrosion in Steam

    2014-8-29 · fired power plants. I observed this directly at one of my two former utilities. At the plant in which I worked, a feedwater heater drain line failed due to FAC, shutting down an 800 MW supercritical unit. Infinitely more serious was FAC-induced failure of an attemperator line in 2007 at another of the utility's stations, which

    Get a Quote
  • Control of Flow-Accelerated Corrosion in Steam

    2014-8-29 · fired power plants. I observed this directly at one of my two former utilities. At the plant in which I worked, a feedwater heater drain line failed due to FAC, shutting down an 800 MW supercritical unit. Infinitely more serious was FAC-induced failure of an attemperator line in 2007 at another of the utility's stations, which

    Get a Quote
  • Proposal of the Estimation Equation of Flow

    There are a few prediction equations for FAC under the two-phase flow condition, but their accuracy is uncertain. In this study, these equations are summarized. A new prediction equation is proposed, in which the liquid film velocity near the wall is taken into account. Also, FAC experiments with water-steam two-phase flow are performed.

    Get a Quote
  • Proposal of the Estimation Equation of Flow

    There are a few prediction equations for FAC under the two-phase flow condition, but their accuracy is uncertain. In this study, these equations are summarized. A new prediction equation is proposed, in which the liquid film velocity near the wall is taken into account. Also, FAC experiments with water-steam two-phase flow are performed.

    Get a Quote
  • The International Association for the Properties of Water

    2017-1-11 · Drum boiler Boiler in which steam (generated in heated evaporator tubes) is separated from water in an unheated horizontal pressure vessel (drum). The liquid phase is recirculated to the evaporator. Economizer First heat transfer section in boiler or HRSG to heat feedwater located in the cold end of the plant Fast Start Combined

    Get a Quote
  • The International Association for the Properties of Water

    2017-1-11 · Drum boiler Boiler in which steam (generated in heated evaporator tubes) is separated from water in an unheated horizontal pressure vessel (drum). The liquid phase is recirculated to the evaporator. Economizer First heat transfer section in boiler or HRSG to heat feedwater located in the cold end of the plant Fast Start Combined

    Get a Quote
  • EXCERPTS FROM: ASME BOILER AND PRESSURE VESSEL

    2020-10-2 · 1 Power boiler − a boiler in which steam or other vapor is generated at a pres-sure of more than 15 psi (100 kPa) for use external to itself. 2 Electric boiler − a power boiler or a high−temperature water boiler in which the source of heat is electricity. 3 Miniature boiler − a power boiler or a high−temperature water boiler in

    Get a Quote
  • EXCERPTS FROM: ASME BOILER AND PRESSURE VESSEL

    2020-10-2 · 1 Power boiler − a boiler in which steam or other vapor is generated at a pres-sure of more than 15 psi (100 kPa) for use external to itself. 2 Electric boiler − a power boiler or a high−temperature water boiler in which the source of heat is electricity. 3 Miniature boiler − a power boiler or a high−temperature water boiler in

    Get a Quote
  • Flow-Accelerated Corrosion Damages Plant Systems |

    2020-9-25 · FAC metal loss is best described as the absence of the protective iron oxide layer that limits corrosion in boiler systems. Without this protection, the surface is free to react with the passing water (or steam-air mixture called two-phase FAC), resulting in rapid metal loss.

    Get a Quote
  • Flow-Accelerated Corrosion Damages Plant Systems |

    2020-9-25 · FAC metal loss is best described as the absence of the protective iron oxide layer that limits corrosion in boiler systems. Without this protection, the surface is free to react with the passing water (or steam-air mixture called two-phase FAC), resulting in rapid metal loss.

    Get a Quote
  • Mitigation of degradation of high energy secondary cycle

    2007-11-7 · resulted in rupture of both single phase and two phase high energy systems piping of secondary cycle in Nuclear Power Plants. pipe lines / locations due to FAC • 10 % feed water line down stream of control valves • Boiler blow down system down stream of control valves near boiler

    Get a Quote
  • Mitigation of degradation of high energy secondary cycle

    2007-11-7 · resulted in rupture of both single phase and two phase high energy systems piping of secondary cycle in Nuclear Power Plants. pipe lines / locations due to FAC • 10 % feed water line down stream of control valves • Boiler blow down system down stream of control valves near boiler

    Get a Quote
  • SERVICE MANUAL - ESpec

    2013-4-12 · obtained by joining the two numbers. Ex. CYC 10 042 means 10042 cycles executed. - cYc Cycle counter (resettable). This counter is similar to CYC but is resettable by user (see rSt parameter below). - nnc Water Consumption. (only for dishwashers with incorporated continuous water softener). Counts m3 of water consumption. m3 L Water Consumption.

    Get a Quote
  • SERVICE MANUAL - ESpec

    2013-4-12 · obtained by joining the two numbers. Ex. CYC 10 042 means 10042 cycles executed. - cYc Cycle counter (resettable). This counter is similar to CYC but is resettable by user (see rSt parameter below). - nnc Water Consumption. (only for dishwashers with incorporated continuous water softener). Counts m3 of water consumption. m3 L Water Consumption.

    Get a Quote
  • Pipe Wall Thinning Phenomena Test Apparatus

    2010-12-28 · in high-wetness two phase piping at actual power plants. Therefore, we began research on this wall thin-ning phenomena and developed 2 test loops, "Water Chemistry Controlled Steam-Water Two-Phase Flow Loop" and "Multi-Purpose Steam Test Apparatus". The first is for FAC in two-phase flow conditions, and

    Get a Quote
  • Pipe Wall Thinning Phenomena Test Apparatus

    2010-12-28 · in high-wetness two phase piping at actual power plants. Therefore, we began research on this wall thin-ning phenomena and developed 2 test loops, "Water Chemistry Controlled Steam-Water Two-Phase Flow Loop" and "Multi-Purpose Steam Test Apparatus". The first is for FAC in two-phase flow conditions, and

    Get a Quote
  • Cycle Chemistry Influenced Failure and Damage

    FAC in Combined Cycle / HRSGs. All the HRSG components within the temperature range (212 – 572°F, 100 – 300°C) are susceptible to FAC which involves both the single- and two-phase variants predominantly in low temperature (LP, IP and HP) economizers / preheaters and evaporators (tubes, headers, risers and drum components such as belly plates).

    Get a Quote
  • Cycle Chemistry Influenced Failure and Damage

    FAC in Combined Cycle / HRSGs. All the HRSG components within the temperature range (212 – 572°F, 100 – 300°C) are susceptible to FAC which involves both the single- and two-phase variants predominantly in low temperature (LP, IP and HP) economizers / preheaters and evaporators (tubes, headers, risers and drum components such as belly plates).

    Get a Quote
  • 2014 Portfolio: Boiler and Turbine Steam and Cycle

    2013-5-31 · control in the steam turbine Phase Transition Zone (PTZ), corrosion in the boiler and water/steam cycle, flow-accelerated corrosion (FAC) in high-energy piping and air-cooled condensers, deposition in major plant components in the water and steam cycle, shutdown/startup/layup, condensate polishing, makeup,

    Get a Quote
  • 2014 Portfolio: Boiler and Turbine Steam and Cycle

    2013-5-31 · control in the steam turbine Phase Transition Zone (PTZ), corrosion in the boiler and water/steam cycle, flow-accelerated corrosion (FAC) in high-energy piping and air-cooled condensers, deposition in major plant components in the water and steam cycle, shutdown/startup/layup, condensate polishing, makeup,

    Get a Quote
  • 2013 Portfolio / Boiler and Turbine Steam and Cycle

    2012-11-16 · • Interim research on two-phase FAC in feedwater heaters and heater drains • Benchmarking processes to assess plant or system chemistries . Current Year Activities . The program Ramp;D for 2013 will focus on reducing corrosion damage associated with FAC and boiler deposits. Specific efforts will include: •

    Get a Quote
  • 2013 Portfolio / Boiler and Turbine Steam and Cycle

    2012-11-16 · • Interim research on two-phase FAC in feedwater heaters and heater drains • Benchmarking processes to assess plant or system chemistries . Current Year Activities . The program Ramp;D for 2013 will focus on reducing corrosion damage associated with FAC and boiler deposits. Specific efforts will include: •

    Get a Quote
  • Water Handbook - Preboiler amp; Industrial Boiler

    2020-10-9 · Where two-phase flow (steam and water) exists, failures due to erosion are caused by the impact of the fluid against a surface. Equipment vulnerable to erosion includes turbine blades, low-pressure steam piping, and heat exchangers that are subjected to wet steam. The boiler water should be tested weekly with treatment added as necessary to

    Get a Quote
  • Water Handbook - Preboiler amp; Industrial Boiler

    2020-10-9 · Where two-phase flow (steam and water) exists, failures due to erosion are caused by the impact of the fluid against a surface. Equipment vulnerable to erosion includes turbine blades, low-pressure steam piping, and heat exchangers that are subjected to wet steam. The boiler water should be tested weekly with treatment added as necessary to

    Get a Quote
  • Boiler feedwater pipe failure by flow-assisted chelant

    Boiler water depressurized from over 900 psi and flashed to steam as it exited the ruptured pipe. releasing high temperature steam or water. FAC has caused a Ni-A coating can be divided

    Get a Quote
  • Boiler feedwater pipe failure by flow-assisted chelant

    Boiler water depressurized from over 900 psi and flashed to steam as it exited the ruptured pipe. releasing high temperature steam or water. FAC has caused a Ni-A coating can be divided

    Get a Quote
  • HRSG water chemistry amp; corrosion control

    Turbulence or high flow velocities contribute significantly by rapidly transporting dissolve Iron from metal surface to the bulk water. Two-phase FAC can occur in the LP evaporator circuits whichTwo-phase FAC can occur in the LP evaporator circuits which typically operates around 60 – 70 psi (0.4 - 0.5 MPa) with atypically operates around 60

    Get a Quote
  • HRSG water chemistry amp; corrosion control

    Turbulence or high flow velocities contribute significantly by rapidly transporting dissolve Iron from metal surface to the bulk water. Two-phase FAC can occur in the LP evaporator circuits whichTwo-phase FAC can occur in the LP evaporator circuits which typically operates around 60 – 70 psi (0.4 - 0.5 MPa) with atypically operates around 60

    Get a Quote
  • ARTICLE All Volatile Treatment – AVT(O) for HRSGs

    2016-3-11 · ometry and material. FAC is often observed in HRSGs pipes in power plants. 5 FAC is a phenomenon that reduces the pressure inside the pipe when in contact with water or water-steam mixture . The risk of FAC depends on the combination of the following factors: 1. Water chemistry (promoting the dissolution of the protective film of oxide

    Get a Quote
  • ARTICLE All Volatile Treatment – AVT(O) for HRSGs

    2016-3-11 · ometry and material. FAC is often observed in HRSGs pipes in power plants. 5 FAC is a phenomenon that reduces the pressure inside the pipe when in contact with water or water-steam mixture . The risk of FAC depends on the combination of the following factors: 1. Water chemistry (promoting the dissolution of the protective film of oxide

    Get a Quote
  • Full text of "Boiler Tube Failure" - Internet Archive

    Full text of "Boiler Tube Failure" See other formats BOILERTUBE FAILER,PREVENTION AND CONTROL SUNDARAVEERRAJU . jApril 5, 2008| Boiler Tube Failure, Pr event ion and C o n t r o I by Veer Raj u Sundara . be,b.o.e., A TRAINING PROGRAM at SUDAN SUGAR COMPANY Assalaya SUDAN ©SUNDARA Introduction The content of this short presentation is to give you the ability to: -

    Get a Quote
  • Full text of "Boiler Tube Failure" - Internet Archive

    Full text of "Boiler Tube Failure" See other formats BOILERTUBE FAILER,PREVENTION AND CONTROL SUNDARAVEERRAJU . jApril 5, 2008| Boiler Tube Failure, Pr event ion and C o n t r o I by Veer Raj u Sundara . be,b.o.e., A TRAINING PROGRAM at SUDAN SUGAR COMPANY Assalaya SUDAN ©SUNDARA Introduction The content of this short presentation is to give you the ability to: -

    Get a Quote
  • Steam-Water Cycle - Our Approach

    2019-7-9 · Mitigate Flow-Assisted Corrosion. Since the Anodamine treatment has an approximately 60 % volatile, 40 % non-volatile partition ratio (see section 60/40 Volatile to Liquid Ratio), protection from FAC occurs both in single, two-phase and all liquid film locations.This unique protection from FAC related damage, oxide transport, tube wall thinning and re-deposition of corrosion products is

    Get a Quote
  • Steam-Water Cycle - Our Approach

    2019-7-9 · Mitigate Flow-Assisted Corrosion. Since the Anodamine treatment has an approximately 60 % volatile, 40 % non-volatile partition ratio (see section 60/40 Volatile to Liquid Ratio), protection from FAC occurs both in single, two-phase and all liquid film locations.This unique protection from FAC related damage, oxide transport, tube wall thinning and re-deposition of corrosion products is

    Get a Quote
  • 2013 Portfolio / Boiler and Turbine Steam and Cycle

    2012-11-16 · • Interim research on two-phase FAC in feedwater heaters and heater drains • Benchmarking processes to assess plant or system chemistries . Current Year Activities . The program Ramp;D for 2013 will focus on reducing corrosion damage associated with FAC and boiler deposits. Specific efforts will include: •

    Get a Quote
  • 2013 Portfolio / Boiler and Turbine Steam and Cycle

    2012-11-16 · • Interim research on two-phase FAC in feedwater heaters and heater drains • Benchmarking processes to assess plant or system chemistries . Current Year Activities . The program Ramp;D for 2013 will focus on reducing corrosion damage associated with FAC and boiler deposits. Specific efforts will include: •

    Get a Quote
  • Mitigation of degradation of high energy secondary cycle

    2007-11-7 · resulted in rupture of both single phase and two phase high energy systems piping of secondary cycle in Nuclear Power Plants. pipe lines / locations due to FAC • 10 % feed water line down stream of control valves • Boiler blow down system down stream of control valves near boiler

    Get a Quote
  • Mitigation of degradation of high energy secondary cycle

    2007-11-7 · resulted in rupture of both single phase and two phase high energy systems piping of secondary cycle in Nuclear Power Plants. pipe lines / locations due to FAC • 10 % feed water line down stream of control valves • Boiler blow down system down stream of control valves near boiler

    Get a Quote
  • Beware of Flow-Accelerated Corrosion - Chemical

    2013-3-1 · Many steam generators, regardless of type, are susceptible to two-phase FAC. As the name implies, this corrosion mechanism occurs where water flashes to steam, resulting in a mixed-phase fluid. For conventional units, feedwater heater shells and heater drains are common locations for two-phase FAC, but this equipment is not common for HRSGs.

    Get a Quote
  • Beware of Flow-Accelerated Corrosion - Chemical

    2013-3-1 · Many steam generators, regardless of type, are susceptible to two-phase FAC. As the name implies, this corrosion mechanism occurs where water flashes to steam, resulting in a mixed-phase fluid. For conventional units, feedwater heater shells and heater drains are common locations for two-phase FAC, but this equipment is not common for HRSGs.

    Get a Quote
  • Flow Accelerated Corrosion Failures in Gas to Liquids

    2019-9-2 · Under high quality, two-phase conditions, the surface may show a pattern of dark and light areas known Tiger-Striping Single-phase (i.e. water only) conditions, the damaged surface displays a "scalloped" or Orange Peel Single-Phase FAC

    Get a Quote
  • Flow Accelerated Corrosion Failures in Gas to Liquids

    2019-9-2 · Under high quality, two-phase conditions, the surface may show a pattern of dark and light areas known Tiger-Striping Single-phase (i.e. water only) conditions, the damaged surface displays a "scalloped" or Orange Peel Single-Phase FAC

    Get a Quote
  • CFD Investigating the Changes of FAC Wear Sites Due

    These models proposed in this paper include the three-dimensional two-phase flow models and appropriate FAC models. The computations are performed using commercial code Fluent 6.2 which is control-volume-based. A boiling water reactor (BWR), located at Taiwan, is

    Get a Quote
  • CFD Investigating the Changes of FAC Wear Sites Due

    These models proposed in this paper include the three-dimensional two-phase flow models and appropriate FAC models. The computations are performed using commercial code Fluent 6.2 which is control-volume-based. A boiling water reactor (BWR), located at Taiwan, is

    Get a Quote
  • (PDF) Flow Accelerated Corrosion: Forms, Mechanisms

    FAC occurs unde r both single and two-phase flo w conditions. As water is ess releasing steam in boiler room typical signature pattern s to establish single or dual phase FAC. Two cas e

    Get a Quote
  • (PDF) Flow Accelerated Corrosion: Forms, Mechanisms

    FAC occurs unde r both single and two-phase flo w conditions. As water is ess releasing steam in boiler room typical signature pattern s to establish single or dual phase FAC. Two cas e

    Get a Quote
  • Effect of Corrosion on Heat Transfer through Boiler Tube

    2014-6-20 · Carbon steel components with water velocities greater than 2.4 – 3 m/s. are particularly susceptible to FAC attack. Also the rate of FAC attack is at a maximum around 130 – 150 ºC for single-phase flow and 150 – 200 ºC for two-phase flow. Fig.1 Flow Accelerated Corrosion

    Get a Quote
  • Effect of Corrosion on Heat Transfer through Boiler Tube

    2014-6-20 · Carbon steel components with water velocities greater than 2.4 – 3 m/s. are particularly susceptible to FAC attack. Also the rate of FAC attack is at a maximum around 130 – 150 ºC for single-phase flow and 150 – 200 ºC for two-phase flow. Fig.1 Flow Accelerated Corrosion

    Get a Quote
  • Reducing Corrosion and Potential Boiler Failure with

    2010-1-10 · FAC is a particular type of erosion. Is quite site specific. Single-phase (all water is in the liquid phase) or two-phase (mixture of liquid and steam) FAC may occur. Maximum attack at 130-150ºC for single-phase and 150-200ºC for two-phase flow. Increasing feed water pH is known to reduce FAC.

    Get a Quote
  • Reducing Corrosion and Potential Boiler Failure with

    2010-1-10 · FAC is a particular type of erosion. Is quite site specific. Single-phase (all water is in the liquid phase) or two-phase (mixture of liquid and steam) FAC may occur. Maximum attack at 130-150ºC for single-phase and 150-200ºC for two-phase flow. Increasing feed water pH is known to reduce FAC.

    Get a Quote
  • Flow Accelerated Corrosion Failures in Gas to Liquids

    2019-9-2 · Under high quality, two-phase conditions, the surface may show a pattern of dark and light areas known Tiger-Striping Single-phase (i.e. water only) conditions, the damaged surface displays a "scalloped" or Orange Peel Single-Phase FAC

    Get a Quote
  • Flow Accelerated Corrosion Failures in Gas to Liquids

    2019-9-2 · Under high quality, two-phase conditions, the surface may show a pattern of dark and light areas known Tiger-Striping Single-phase (i.e. water only) conditions, the damaged surface displays a "scalloped" or Orange Peel Single-Phase FAC

    Get a Quote
  • EPRI's Guideline on Chemistry for Fossil Units with Air

    2014-9-8 · A two-phase mixture of water and steam exits the low pressure turbine, and is directed to the top distribution ducts of individual ACC modules via a network of transfer ducts. This arrangement results in contact with a far greater area of carbon steel surface than occurs in units with a water-cooled condenser (WCC).

    Get a Quote
  • EPRI's Guideline on Chemistry for Fossil Units with Air

    2014-9-8 · A two-phase mixture of water and steam exits the low pressure turbine, and is directed to the top distribution ducts of individual ACC modules via a network of transfer ducts. This arrangement results in contact with a far greater area of carbon steel surface than occurs in units with a water-cooled condenser (WCC).

    Get a Quote
  • Flow Accelerated Corrosion: Forms, Mechanisms and Case

    2017-1-24 · pipe geometry and flow velocity. FAC is the most destructive corrosion mechanism for high energy carbon steel components in light water reactors 3,6-11. The maximum in FAC rate appear at ~ 150 °C 3-5, 10. It has caused rupture of large, medium and small diameter pipelines carrying either single phase (single phase FAC) or two phase

    Get a Quote
  • Flow Accelerated Corrosion: Forms, Mechanisms and Case

    2017-1-24 · pipe geometry and flow velocity. FAC is the most destructive corrosion mechanism for high energy carbon steel components in light water reactors 3,6-11. The maximum in FAC rate appear at ~ 150 °C 3-5, 10. It has caused rupture of large, medium and small diameter pipelines carrying either single phase (single phase FAC) or two phase

    Get a Quote
  • The International Association for the Properties of Water

    2017-1-11 · Drum boiler Boiler in which steam (generated in heated evaporator tubes) is separated from water in an unheated horizontal pressure vessel (drum). The liquid phase is recirculated to the evaporator. Economizer First heat transfer section in boiler or HRSG to heat feedwater located in the cold end of the plant Fast Start Combined

    Get a Quote
  • The International Association for the Properties of Water

    2017-1-11 · Drum boiler Boiler in which steam (generated in heated evaporator tubes) is separated from water in an unheated horizontal pressure vessel (drum). The liquid phase is recirculated to the evaporator. Economizer First heat transfer section in boiler or HRSG to heat feedwater located in the cold end of the plant Fast Start Combined

    Get a Quote
  • Single Phase Steam Boiler Philippines

    Steam Boiler Turbine - ferienwohnung-louisiana.de. steam boiler turbine,steam boiler brochure. 2017-9-11 · Zhengzhou Boiler Co., Ltd, founded in 1945, is a joint-stock enterprise with A1, A2, C3 boiler and pressure vessel design and manufacture license permits. 70 years' experience in boiler and pressure vessel design and manufacturing has rewarded us with an industrial boiler(oil amp; gas fired

    Get a Quote
  • Single Phase Steam Boiler Philippines

    Steam Boiler Turbine - ferienwohnung-louisiana.de. steam boiler turbine,steam boiler brochure. 2017-9-11 · Zhengzhou Boiler Co., Ltd, founded in 1945, is a joint-stock enterprise with A1, A2, C3 boiler and pressure vessel design and manufacture license permits. 70 years' experience in boiler and pressure vessel design and manufacturing has rewarded us with an industrial boiler(oil amp; gas fired

    Get a Quote
  • Flow Accelerated Corrosion in Nuclear Power Plants

    2012-10-3 · economic loss. FAC is a process caused by the flowing water or wet steam damaging or thinning the protective oxide layer of piping components. The FAC process can be described by two mechanisms: the first mechanism is the soluble iron production (Fe2+) at the oxide/water interface, while the second mechanism is the transfer of the corrosion

    Get a Quote
  • Flow Accelerated Corrosion in Nuclear Power Plants

    2012-10-3 · economic loss. FAC is a process caused by the flowing water or wet steam damaging or thinning the protective oxide layer of piping components. The FAC process can be described by two mechanisms: the first mechanism is the soluble iron production (Fe2+) at the oxide/water interface, while the second mechanism is the transfer of the corrosion

    Get a Quote
  • Predicting and Preventing Flow Accelerated Corrosion

    Flow accelerated corrosion (FAC) of carbon steels in water has been a concern in nuclear power production for over 40 years. Many theoretical models or empirical approaches have been developed to predict the possible occurrence, position, and rate of FAC. There are a number of parameters, which need to be incorporated into any model. Firstly there is a measure defining the hydrodynamic

    Get a Quote
  • Predicting and Preventing Flow Accelerated Corrosion

    Flow accelerated corrosion (FAC) of carbon steels in water has been a concern in nuclear power production for over 40 years. Many theoretical models or empirical approaches have been developed to predict the possible occurrence, position, and rate of FAC. There are a number of parameters, which need to be incorporated into any model. Firstly there is a measure defining the hydrodynamic

    Get a Quote
  • Flow-Accelerated Corrosion in Fossil and Combined Cycle

    2019-9-9 · plexity of FAC in high energy systems was not fully appre-ciated. Since 1986, there have been three more incidents where plant workers have unfortunately been killed as a result of single-phase FAC: Pleasant Prairie (1995), Mihama (2004) and most recently at Iatan (2007). Numerous incidents of two-phase FAC have also taken place.

    Get a Quote
  • Flow-Accelerated Corrosion in Fossil and Combined Cycle

    2019-9-9 · plexity of FAC in high energy systems was not fully appre-ciated. Since 1986, there have been three more incidents where plant workers have unfortunately been killed as a result of single-phase FAC: Pleasant Prairie (1995), Mihama (2004) and most recently at Iatan (2007). Numerous incidents of two-phase FAC have also taken place.

    Get a Quote
  • Control of Flow-Accelerated Corrosion in Steam

    2014-8-29 · fired power plants. I observed this directly at one of my two former utilities. At the plant in which I worked, a feedwater heater drain line failed due to FAC, shutting down an 800 MW supercritical unit. Infinitely more serious was FAC-induced failure of an attemperator line in 2007 at another of the utility's stations, which

    Get a Quote
  • Control of Flow-Accelerated Corrosion in Steam

    2014-8-29 · fired power plants. I observed this directly at one of my two former utilities. At the plant in which I worked, a feedwater heater drain line failed due to FAC, shutting down an 800 MW supercritical unit. Infinitely more serious was FAC-induced failure of an attemperator line in 2007 at another of the utility's stations, which

    Get a Quote
  • Reducing Corrosion and Potential Boiler Failure with

    2010-1-10 · FAC is a particular type of erosion. Is quite site specific. Single-phase (all water is in the liquid phase) or two-phase (mixture of liquid and steam) FAC may occur. Maximum attack at 130-150ºC for single-phase and 150-200ºC for two-phase flow. Increasing feed water pH is known to reduce FAC.

    Get a Quote
  • Reducing Corrosion and Potential Boiler Failure with

    2010-1-10 · FAC is a particular type of erosion. Is quite site specific. Single-phase (all water is in the liquid phase) or two-phase (mixture of liquid and steam) FAC may occur. Maximum attack at 130-150ºC for single-phase and 150-200ºC for two-phase flow. Increasing feed water pH is known to reduce FAC.

    Get a Quote
  • Water Chemistry: Power Plant Life and Death

    2020-1-1 · In 2004, five employees were killed due to a FAC-caused pipe rupture at Mihama Unit 3 in Japan (Figure 2), and in 2007, two FAC-related fatalities and one serious injury occurred at

    Get a Quote
  • Water Chemistry: Power Plant Life and Death

    2020-1-1 · In 2004, five employees were killed due to a FAC-caused pipe rupture at Mihama Unit 3 in Japan (Figure 2), and in 2007, two FAC-related fatalities and one serious injury occurred at

    Get a Quote
  • (PDF) Flow Accelerated Corrosion: Forms, Mechanisms

    FAC occurs unde r both single and two-phase flo w conditions. As water is ess releasing steam in boiler room typical signature pattern s to establish single or dual phase FAC. Two cas e

    Get a Quote
  • (PDF) Flow Accelerated Corrosion: Forms, Mechanisms

    FAC occurs unde r both single and two-phase flo w conditions. As water is ess releasing steam in boiler room typical signature pattern s to establish single or dual phase FAC. Two cas e

    Get a Quote
  • Chapter 10 VAPOR AND COMBINED POWER CYCLES

    2016-12-18 · The Carnot cycle is the most efficient cycle operating between two specified temperature limits but it is not a suitable model for power cycles. Because: Process 1-2 Limiting the heat transfer processes to two-phase systems severely limits the maximum temperature that can be used in the cycle (374°C for water)

    Get a Quote
  • Chapter 10 VAPOR AND COMBINED POWER CYCLES

    2016-12-18 · The Carnot cycle is the most efficient cycle operating between two specified temperature limits but it is not a suitable model for power cycles. Because: Process 1-2 Limiting the heat transfer processes to two-phase systems severely limits the maximum temperature that can be used in the cycle (374°C for water)

    Get a Quote
  • ARTICLE All Volatile Treatment – AVT(O) for HRSGs

    2016-3-11 · ometry and material. FAC is often observed in HRSGs pipes in power plants. 5 FAC is a phenomenon that reduces the pressure inside the pipe when in contact with water or water-steam mixture . The risk of FAC depends on the combination of the following factors: 1. Water chemistry (promoting the dissolution of the protective film of oxide

    Get a Quote
  • ARTICLE All Volatile Treatment – AVT(O) for HRSGs

    2016-3-11 · ometry and material. FAC is often observed in HRSGs pipes in power plants. 5 FAC is a phenomenon that reduces the pressure inside the pipe when in contact with water or water-steam mixture . The risk of FAC depends on the combination of the following factors: 1. Water chemistry (promoting the dissolution of the protective film of oxide

    Get a Quote
  • BWT-PG-CH-N460-02.14 FAC Mitigation at Combined

    2018-4-20 · LP drums. The visible areas of two-phase FAC had been reduced with surfaces appearing dull and not shiny as in previous inspections. The hotwell looked much better than the previous inspection and was no longer bright red as before. Organic acids appeared to be concentrating in the kettle boilers and creating a higher demand for the

    Get a Quote
  • BWT-PG-CH-N460-02.14 FAC Mitigation at Combined

    2018-4-20 · LP drums. The visible areas of two-phase FAC had been reduced with surfaces appearing dull and not shiny as in previous inspections. The hotwell looked much better than the previous inspection and was no longer bright red as before. Organic acids appeared to be concentrating in the kettle boilers and creating a higher demand for the

    Get a Quote
  • MATERIAL REQUIREMENTS AND 7 SPECIFICATIONS FOR

    2018-4-4 · •Flow- Accelerated Corrosion (FAC) is a corrosion process that degrades carbon steel material •Degradation occurs under certain temperatures and specific chemistry conditions •FAC requires that flowing water or water/steam be present •FAC is normally related to turbulence especially near fittings, e.g., elbows, tees, orifices, valves.

    Get a Quote
  • MATERIAL REQUIREMENTS AND 7 SPECIFICATIONS FOR

    2018-4-4 · •Flow- Accelerated Corrosion (FAC) is a corrosion process that degrades carbon steel material •Degradation occurs under certain temperatures and specific chemistry conditions •FAC requires that flowing water or water/steam be present •FAC is normally related to turbulence especially near fittings, e.g., elbows, tees, orifices, valves.

    Get a Quote
  • EPRI's Guideline on Chemistry for Fossil Units with Air

    2014-9-8 · A two-phase mixture of water and steam exits the low pressure turbine, and is directed to the top distribution ducts of individual ACC modules via a network of transfer ducts. This arrangement results in contact with a far greater area of carbon steel surface than occurs in units with a water-cooled condenser (WCC).

    Get a Quote
  • EPRI's Guideline on Chemistry for Fossil Units with Air

    2014-9-8 · A two-phase mixture of water and steam exits the low pressure turbine, and is directed to the top distribution ducts of individual ACC modules via a network of transfer ducts. This arrangement results in contact with a far greater area of carbon steel surface than occurs in units with a water-cooled condenser (WCC).

    Get a Quote
  • MATERIAL REQUIREMENTS AND 7 SPECIFICATIONS FOR

    2018-4-4 · •Flow- Accelerated Corrosion (FAC) is a corrosion process that degrades carbon steel material •Degradation occurs under certain temperatures and specific chemistry conditions •FAC requires that flowing water or water/steam be present •FAC is normally related to turbulence especially near fittings, e.g., elbows, tees, orifices, valves.

    Get a Quote
  • MATERIAL REQUIREMENTS AND 7 SPECIFICATIONS FOR

    2018-4-4 · •Flow- Accelerated Corrosion (FAC) is a corrosion process that degrades carbon steel material •Degradation occurs under certain temperatures and specific chemistry conditions •FAC requires that flowing water or water/steam be present •FAC is normally related to turbulence especially near fittings, e.g., elbows, tees, orifices, valves.

    Get a Quote
  • THE INTERACTION OF A FILM-FORMING AMINE WITH

    2016-1-8 · in two-phase run: hot single-phase section to throttle valve at 297°C, 220°C and 210°C; two-phase section after throttle valve at 200°C and voidage respectively 97%, 80% and 60%. The concentration changes of FFA were used to obtain the adsorption/desorption kinetics in the loop following the modelling shown below. Bench-Top Experiments

    Get a Quote
  • THE INTERACTION OF A FILM-FORMING AMINE WITH

    2016-1-8 · in two-phase run: hot single-phase section to throttle valve at 297°C, 220°C and 210°C; two-phase section after throttle valve at 200°C and voidage respectively 97%, 80% and 60%. The concentration changes of FFA were used to obtain the adsorption/desorption kinetics in the loop following the modelling shown below. Bench-Top Experiments

    Get a Quote
  • Flow-Accelerated Corrosion amp; Cavitation | WWD

    2020-10-6 · Flow-accelerated corrosion (FAC)—also called erosion-corrosion (E-C)—and cavitation are significant and costly damage mechanisms common to all types of utility and industrial steam and hot water cycles. There has been an increased emphasis on correcting these problems due to fatal accidents that occurred in 1986, 1995, 1996 and 2004.

    Get a Quote
  • Flow-Accelerated Corrosion amp; Cavitation | WWD

    2020-10-6 · Flow-accelerated corrosion (FAC)—also called erosion-corrosion (E-C)—and cavitation are significant and costly damage mechanisms common to all types of utility and industrial steam and hot water cycles. There has been an increased emphasis on correcting these problems due to fatal accidents that occurred in 1986, 1995, 1996 and 2004.